Hornbill Unleashed

April 19, 2017

Sarawak’s LRT to be ready by 2020, says CM

Filed under: Politics — Hornbill Unleashed @ 8:01 AM

Sarawak Chief Minister Datuk Amar Abang Johari said a light rail transit (LRT) system connecting Kuching, Samarahan and Serian divisions could be built by 2020. — File picture by Sulok TawieA light rail transit (LRT) system connecting Kuching, Samarahan and Serian divisions could materialise by 2020, Sarawak Chief Minister Datuk Amar Abang Johari Abang Openg said.

He said the LRT system was being studied for inclusion in the public transport plan to solve traffic congestion in the three divisions as their total population had reach one million.

“We are now surveying the route. The study will take six months, after that, we will find the right technology and the right partner.

“Since we already have the power from the Bakun dam, we can use electric train technology,” he told a press conference after witnessing the signing of a tripartite memorandum of understanding (MoU) for Sarawak’s methanol and methanol derivatives project here today.

Sarawak will undertake a methanol and methanol derivatives project with the first plant worth US$800 million (US$1=RM4.40) expected to be ready by 2021.

Abang Johari who has just returned from his official visit to the United Kingdom said the LRT project would incorporate the latest technology with less carbon pollution.

“We will consider extending the (LRT) project to other divisions once they reach their economic viability.

That is, when the rural areas are developed in terms of modern agricultural economy and with the information and communications technology having reached two Terabit per second (Tbps) of Internet speed,” he added.

The MoU for the engineering, procurement, construction and commissioning for the methanol project witnessed by Abang Johari, was signed between the Sarawak government’s entity, Yayasan Hartanah Bumiputera Sarawak, and a consortium between China Huanqiu Contracting and Engineering Co Ltd and MACfeam Sdn Bhd, a subsidiary of Pegasus Diversified Bhd.


Source : @ Bernama


Advertisements

2 Comments »

  1. Sarawakians like to remind Abang Johari that the stretch of road between mile 10 to mile 15 had taken the state government 15 fuking years to reimplement.

    Comment by Awaken Dayak — April 20, 2017 @ 7:19 PM | Reply

  2. I hope it will not become another NATO

    Comment by tigeryk — April 19, 2017 @ 9:26 PM | Reply


RSS feed for comments on this post. TrackBack URI

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

Create a free website or blog at WordPress.com.

%d bloggers like this: